PROJECT 2: WEST LOOP TRACK REPAIR - NICOL BRIDGE

Project 2: West Loop Track Repair Near Nicol Bridge

The purpose of this project is to repair an area on the west loop near the Nicol bridge that needs about 40 feet of track repaired including moving a switch to a new location in order to provide better transition coming out of a curve heading towards the Nicol bridge. The project had a little scope creep along the way with the addition of a 100-foot retaining wall that was also added in the area the track was repaired.

Upcoming Workdays

Workday Photos - February 24, 2024