TRACK CONSTRUCTION
Track Radius Calculations
Transfer Lift
Featured
Back in 2012 the club took a hydraulic car lift and added three 20-foot tracks sections so we can transfer 60-feet of train at one time.
Switch Construction
Post News
Container Bridge Footing (Pier)
Featured
The following represents the track alignment and footing (pier) for container bridge. The information represents what was done with green member container 2.
Track Construction Videos
Featured
The video s hows how we are modifying the frog guard. The purpose of the modification is so the foot of the grog guard doesn’t get in the way rail.